2017年1月15日星期日

Water filling method for centrifugal pump

Centrifugal pump before the start of the water filling method are mainly two: one is the end of valve assembly is filled with water, at the end of valve check valve, installed in the water inlet pipe of the import, the shortcomings of this approach is at the end of the valve head loss is large enough to affect the efficiency of pump device; the other a is no bottom valve is filled with water, the greatest advantage of this method is energy-saving, with respect to the bottom of the pumping station can be saving 10% ~ 15%. The following describes several centrifugal pump water filling method, for users to choose to run the pump.
Artificial filling method for the inlet diameter is less than 300mm of small pumping station, in the inlet pipe imports are usually provided with a bottom valve, the general use of the artificial recharge of water law, namely from the upper part of the pump shell special filling water exhaust hole by a water filled funnel (or a removed inverted bottle bottom of the ordinary bottles) filled with water. The inlet diameter is less than 300mm for a small pumping station, in the inlet pipe imports are usually provided with a bottom valve can also be from the pump outlet pipe mouth (short outlet pipe of the pump) to pump water filled. Because there is no need to purchase other water filling equipment, in the current rural small pumping station, the water filling method is common.
Not the end of the valve, a non-return valve and a shorter pipeline of small pumping stations can also be used to start the one hand, side from the mouth of the outlet pipe to pump water filled way, thus the pumps and pipes in the air is gradually carried out, the general continuous water filled a few minutes later, the pump can be normal pumping work.

Stainless steel centrifugal pump installation adjustment and correction method

1.  Stainless steel centrifugal pump elevation adjustment

Centrifugal pump elevation adjustment is easy to pump and pipeline connection. In general the elevation to pump axis for measuring points, to pump based on calibration of foundation elevation is used as the measuring datum, level connectivity is measured. For the strict requirements of the centrifugal pump, the elevation adjustment with leveling instrument.

2. Stainless steel centrifugal pump to find the level of

Centrifugal pump find first level degree in looking after the elevation, it is through temporary pad iron level adjustment to adjust the level of degree. The level of centrifugal pump adjustment with a precision of 0.02 mm / m level instrument and the pump inlet and outlet flange face or on the pump shaft were measured. The horizontal split pump can level instrument on the level divided into surface or pump shaft and import and export flange surface measurement.

3. Positioning and correction of the centrifugal pump

The positioning of the centrifugal pump and correction is mounting pump based on according to the center line of the vertical and horizontal center line in order to meet the requirements. In the installation process of the centrifugal pump, centrifugal pump for the size of type the and motor share a base, installation are with integral installation method, the pump and motor and frame together as a whole stable hanging to the foundation, and location and correction. For large centrifugal pump usually first frame lifting in place and adjust the center position and level, the pump and motor lifting to the base to adjust the level of degree of coupling shaft end distance.