2016年11月7日星期一

Vertical horizontal pipeline pump manufacturers wholesale

Vertical horizontal pipeline pump manufacturers wholesale Where? Vertical horizontal pipeline pump manufacturers wholesale where cheap? Such a problem, whether it is pipeline pump pump or pipeline pump on behalf of the user, are very concerned about this issue, are looking for quality and cheap history of horizontal pipeline pump wholesale manufacturers.
Shanghai Weihu Pump Co., Ltd., is a professional pipeline pump production enterprises, the production pipeline pump products are: single-stage pipeline pump, light multi-stage pipeline pump, high-rise building water supply pipeline pump, stainless steel pipeline pump, horizontal pipeline pump etc The company's vertical horizontal pipeline pump sales cover the entire Shanghai urban area and sell well in Zhejiang, Jiangsu, Jiangxi, Guizhou, Hunan, Chongqing, Sichuan, Xi'an, Shanghai, Anhui, Henan, Gansu, Xinjiang and other provinces and autonomous regions.
The following is Shanghai Wei Shanghai pump according to the user consultation out of the pipeline pump manufacturers wholesale-related issues:
1. How about your pipeline pump products?
A: Hello, thank you for consulting our factory pipeline pump products, Shanghai Weihu Pump has decades of pipeline pump production experience, pipeline pump production experience, the production pipeline pump products tested by the national authority of qualified departments, you can rest assured buy.
2. What are the specific models of your pipeline pump products?
A: Hello, thank you for consulting our factory pipeline pump products, our company has vertical, horizontal pipeline pump products, with dozens of signal parameters pipeline pump products, you can step on the Shanghai Wei Shanghai pipeline pump product area specific understanding .
3. You are a pipeline pump manufacturers or brokers?
Our company is a professional pipeline pump manufacturer, our company in Shanghai, Henan, Jiangsu, Xinjiang, have a production base, you are welcome to visit the study tour.
4. Pipeline pump how many pieces from the grant?
A: I produced the Shanghai Wei Shanghai pipeline pump, one from the grant to support the blank area to join sales.

Pump water, pump self-priming pump, suction pump suction

【Diversion】
    In the pump industry, the water guide specifically refers to the water. Because some of the pumps before work, you must manually add water to make the pump interior to form a closed environment, pump parts and then movement to create a partial vacuum in order to allow external water pressure in the internal and external pressure by the atmospheric pressure into the pump inlet to complete the suction action . For example, the previous rural water tank, it must first increase the water, in order to suck up the water wells.
【Self-priming】 mainly used in pumps, pumps, is a more important parameter.
    1. The meaning of self-absorption
    As the name suggests, self-absorption refers to the ability to automatically absorb water, that is, before the pump work, even if all the water pipes in the case of the air, without pre-added water, the pump will automatically pump the water pumped down below Go.
    2. Self-priming principle
    When the pump is in the air, the negative pressure (vacuum) formed by the pump work will be lower than the water pressure of the pumping port under the action of the atmospheric pressure and then discharged from the water discharge end of the pump. This process does not need to add water (guide water). With this ability to pump called self-priming pump.
    Some centrifugal or rotary vane pump before the suction, must be added in the pump chamber to form a closed environment, and then pump the formation of negative pressure in order to achieve the purpose of water. Such as in rural areas before the manual pump. No self-priming pump, every time before adding water is very troublesome.
【Suction】 suction height is called suction. Units are generally meters;
    Also known as the maximum self-priming height. Ie the maximum height (the vertical distance of the pump outlet from the surface to be pumped) that is automatically pumped up without water. Our pumps are self-priming pumps, the standard suction process refers to this situation. Some centrifugal pumps do not have self-priming capacity, the first use must be added water for the job. Some diaphragm pumps, although there are self-priming capacity, but the suction process is often associated with the inlet pipe is all the air can draw the vertical height of the water gap, which please note.
    Suction of the level, with the pump power, flow, structure and so on, but limited by the size, power, general micro-pump self-absorption process is not easy to do higher, because a maximum pressure of water pressure The height of 10.3 meters (because of an atmospheric pressure ≈ 10.3 m water column pressure), so the maximum self-suction process is about 10.3 meters. However, in actual operation, due to sealing performance reasons, the suction is generally not more than 6.5 meters.

2016年11月6日星期日

Precautions for Vacuum Pump Selection

Vacuum pump prices, rotary vane vacuum pump, vacuum pump selection
1, the ultimate pressure of the vacuum pump should meet the working pressure of the process. It is usually chosen that the pump's ultimate pressure is less than about one order of magnitude of the process requirement.
2, each pump has a certain working pressure range, therefore, the pump operating point should be selected within this range, and not allow it to work outside the long hours of work pressure.
3, the vacuum pump at its working pressure, should be able to drain away the vacuum equipment in the process of generating all the gas volume.
4, select the vacuum unit:
   (1) When using a pump can not meet the pumping and vacuum requirements, the need for several pumps together, complement each other to meet the process requirements.
   (2) Some vacuum pumps can not work at atmospheric pressure, the need for pre-vacuum; some vacuum pump outlet pressure is lower than atmospheric pressure, the need for the former pump, it is necessary to combine the use of the pump. The combination of the vacuum pump, we call the vacuum pump unit, which can make the vacuum system to get a better vacuum and displacement. We should choose the correct combination of vacuum pump, because different vacuum pump on the gas extraction requirements are different requirements, for example: in general, Roots - rotary unit is not suitable for containing more condensable gas system.
5. When you choose the oil seal pump, you should first understand whether your vacuum system is oil pollution requirements. If the rigorous requirements of oil-free equipment, should choose a variety of oil-free pumps, such as: water ring pump, cryogenic pumps. If the requirements are not strict, you can choose a pump, coupled with a number of anti-pollution measures, such as cold trap, block oil trap, baffle, but also to achieve clean vacuum requirements.
6, to understand the gas composition was pumped, the gas contains no condensable steam, with or without particulate dust, corrosive and so on. When selecting a vacuum pump, it is necessary to know the gas composition and to select the pump for the pumped gas. If the gas contains steam, particles, and corrosive gases, should be considered in the pump inlet pipe on the installation of auxiliary equipment, such as condensers, dust and so on.
7, when the choice of oil seal vacuum pump, to consider the vacuum pump discharged from the oil vapor (soot) on the impact of the environment. If the environment does not allow pollution, should choose oil-free vacuum pump, or the oil vapor to the outside.
8, the vibration of the vacuum pump work on the process and whether the impact of the environment, if the process does not allow, should choose no vibration of the pump or take anti-vibration measures.
9, the price of vacuum pumps, operation and maintenance costs.
   Once we have taken into account the various circumstances before we can finalize a solution for your adaptation:
   (1) the minimum investment costs.
   (2) the minimum production operating costs.
   (3) the first two cases a reasonable and even distribution of feasible option

Maintenance of Vertical Centrifugal Pump

In-service maintenance and repair
      1, the inlet pipe must be highly sealed, can not leak, leak;
      2, prohibit GDL vertical centrifugal pump in the cavitation state long-term operation;
      3, prohibits GDL-type vertical centrifugal pump running in high-flow conditions, the motor over-current long-term operation;
      4, regular inspection GDL vertical centrifugal pump running the motor current value, as far as possible within the scope of the pump design to run;
      5, GDL-type vertical centrifugal pump should be in the operation of care, in order to avoid accidents;
      6, GDL-type vertical centrifugal pump should run every 500 hours to refuel the bearing;
      7, GDL-type vertical centrifugal pump for long-term operation, due to mechanical wear and tear, so that the unit noise and vibration increases, should stop inspection, the need to replace the vulnerable parts and bearings, unit overhaul period is generally one year.
      Mechanical seal maintenance and repair
      1, mechanical seal lubricating fluid should be clean without solid particles;
      2, is strictly prohibited mechanical seal dry grinding in the case of work;
      3, start before the plate pump (motor) a few laps, so as to avoid a sudden start mechanical seal fracture damage.

2016年11月3日星期四

Checking Method of No - load Operation of Motor for Deep Well Pump

When using the vertical deep well submersible pump, how to carry on the idling operation examination to the deep well pump electric motor. The following by our deep well pump manufacturers in Shanghai weihu and we simply talk about the inspection method.
    First, check the oil, the correct amount of oil should be in the middle of the oil marked the middle position. Oil shortage should be appropriate to add 10 mechanical oil, oil should be appropriate to put too much oil.
    Second, check the wiring is completed, you can electrify for no-load operation. If the motor does not turn should immediately stop, and the power cord of any two for another then start; if the motor has not yet started, you should carefully check the power supply system is not good, whether there is two-phase power supply or power is not connected.
    Third, the motor starts to complete the speed to stabilize, the motor should be parking for mechanical inspection. The mechanical connection parts such as the emergence of loose, falling or collision and other phenomena, should be adjusted and repaired.
    Fourth, the motor no-load operation should be continued for 2-3 hours, running in time to check for irregularities or sound appears. After the end of the operation check whether the bearing overheating situation. If there are abnormal circumstances, should be adjusted and repaired immediately.

Shanghai pump manufacturers to talk about when the pump overhaul need to pay attention to what

Pump overhaul cycle is based on the operation and technical conditions to determine the unit, "Pump Station Technical Management" provides that the pump overhaul cycle: the main pump for 3-5 years or 2500-15000 hours of operation, the main motor 3-8 years or 3000-20000 hours of operation. And may advance or postpone overhaul according to the situation.
    In determining the pump overhaul cycle and workload, we should pay attention to several aspects, the following by the Chinese pump manufacturers say as follows:
     First, if there is no special requirements, try to avoid disassembly technology can be good parts and bodies.
     Second, should try to extend the maintenance cycle. According to the wear and tear parts, similar equipment running tests, equipment performance indicators to determine the pump overhaul cycle, regardless of the wear of certain parts. Therefore, the overhaul should be planned in order to ensure the normal operation of the unit.
     Third, as far as possible to avoid the demolition of all components of the unit body, especially the precision, finish, with the requirements of high components, institutions.

Shanghai pump manufacturers to talk about the structure and cooling form of centrifugal pump

In the use of centrifugal pumps, we will reduce the centrifugal pump sealing temperature to improve the efficiency and service life of centrifugal pumps, the following by our Shanghai pump manufacturers to say,
    First of all, we say that the centrifugal pump seal structure
    1, single-ended centrifugal pump seal: the use of injection-type washing, washing liquid is about 100 ℃ by the second line of wax oil, the pressure than the sealed cavity high 0.05-0.15Mpa. Gland outside the use of hot water (soft water) for rapid cooling. One cycle (ten months) can be used in general.
    2, centrifugal pump metal bellows seal: compact, easy to install, in the case of the same auxiliary system, the life of 2-3 times the normal seal.
    3, centrifugal pump double-end mechanical seal: the cycle of washing, plus external cooling, life is single-sided 1.5-2 times.
    4, centrifugal pump friction pair selection hard to hard (YG6 / YG8, SiC / SiC, etc.), high viscosity, with a small amount of solid particles of the medium or crystallization of the media, have a good effect.
    Then we talk about the centrifugal pump cooling form.
    1, domestic centrifugal pump in the sealed chamber around the cooling water jacket set to cool the water, can seal the chamber temperature is reduced to 200-250 ℃.
    2, on the single-ended seal, the use of injection-type cleaning, from the outside lead clean, the temperature of about 100 ℃ wax oil (usually without diesel, because diesel is finished), both reduce the temperature and improve the working environment is effective Approach.
    3, gland outside the use of quench water; in addition to lower temperatures, but also to prevent clogging sewer.